| Location: | Las Vegas, NV |
| Owners: | Nevada Power |
| General Contractor: | LG |
| Architect/Engineers: | LG |
| Square Footage: | |
| Construction Cost: | $2,100,000 |
| Year Complete: | 2007 |
| Scope of Work: |
Install all underground; Gas Pipe, Aqueous Ammonia Pipe, Fire Water Pipe, Raw Water Pipe, Potable Water Pipe, and Demen Water Pipe. |
| Highlights of the Job: | The job was a combination of the traditional Carbon Steel welding and the newer HDPE Fusion welding. Both were preformed to the highest quality and standards. |